If you want to transfer data later, you have the following options: Setup does not transfer any data or settings to the new installation. You can uninstall Allplan 2019 and then upgrade from Allplan 2016/2017/2018. First-time installation and copy data from version You can integrate the data manually (requires administrative knowledge).Ģ. This option installs Allplan 2019 to a new folder without affecting any other Allplan installation (2018 or earlier).
You can configure Setup to automatically copy the office standard (\std), projects (\prj) and user data (\usr) from Allplan 2016/2017/2018 to the new installations folder. This duplicates the data: You can use all projects, defaults and resources both in Allplan 2018 and in Allplan 2016/2017/2016. This way, you can test the new version without losing your 'old' Allplan version.īear in mind, though, that you should not mix data from different versions. Continue with first-time installation and copy data from version Merging data later involves considerable time and effort.Ģa.
This option is available when you have already used the second installation option to install to a computer that accesses the same data server. Upgrade and transfer data from Allplan 2016/2017/2018 As a result, the data are already available.ģ.
This option installs Allplan 2019 to an existing folder, converting Allplan 2016/2017/2018 to Allplan 2019 and transferring all important settings. Afterwards, you can no longer work with Allplan 2016/2017/2018. If you work in a network environment (one common central file storage folder), you must upgrade all workstations to Allplan 2019.This does nor affect earlier Allplan versions (Allplan 2015 or earlier). Beforeyou start installing, make sure that all workstations can be upgraded. For technical reasons, it is not possible to mix installations of different major releases. When installing with Workgroup Manager, make sure all workstations are checked in before you start upgrading.ĭata from earlier Allplan versions need to be converted to version 2019.During the upgrade, Allplan 2016/2017/2018 must not be running on any workstation.Any related problems area not covered by service contracts.
NEMETSCHEK ALLPLAN TUTORIAL PDF ARCHIVEĬlick here for instructions on how to convert all projects in a single operation:Ĭlick here for instructions on how to get your activation codes for Allplan IBD: Allplan 2019 automatically converts the data of a project you open.NEMETSCHEK ALLPLAN TUTORIAL PDF INSTALL.